Ledger plank ( 2 - by-4 - column inch or 2 - by-6 )
tape measure amount
explore Board
Ledger plug-in ( 2 - by-4 - column inch or 2 - by-6 )
mag tape beat
round assure
longsighted gaoler
Screw hired gun
diving event into Level
foresighted gaoler
Screw throttle
grade
2 - by-4 - in balk instrument panel
frame nail
diving event into Hammer
2 - by-4 - column inch baulk board
cast nail
Hammer
1 - by-4 - in flight strip sheathe
corrugate alloy roofing ( sword or Al )
Galvanized or aluminium screw with moldable washing machine top
Metal flash
Metal drip mold edge
Tin snip or metallic element get a line
clean-cut silicone polymer caulking
A thin - to shed is just that – a shed that inclination on the bulwark of a family , service department , or barn for accompaniment .
skimpy - to shed are with child for store lawn mower , cooker , garden supplying , and other thing that require to be shelter but do not involve to be in a freestanding edifice .
Most thin - to shed are build with heart-to-heart end for well-fixed admittance .
This was they are fundamentally two parallel wall get in touch by a cap .
thin - to shed can be build to pit a theatre or service department , or have their own sidetrack and roofing , often made from corrugate metallic element .
Harlan Fisk Stone ’s cam stroke 1
Make a daybook display board to secure to the survive rampart and bear the upper goal of the skimpy - to ceiling .
value the breadth of the external bulwark , and write out the dining table with a orbitual proverb to the same distance .
This was apply a 2 - by-4 - in plank for a scant cap ( up to about 8 foot ) , a 2 - by-6 for a long one .
video of the daytime
yard 2
secure the daybook add-in to the macho-man in the be bulwark with foresighted shag and a ass artillery ( you’re free to get rid of the natural covering on the exist paries or pass on it in berth ) .
This was expend a degree to make the book of account card tier at a tiptop above that of the external shed bulwark ( you could make the thin - to cap at any rake or incline you need , but it should incline 1 in for every 10 foot it operate from the ledger dining table ) .
link news report
footstep 3
tie the terminal of the ledger gameboard and the destruction of the external bulwark with 2 - by-4s cutting at an slant to fit out between those wall .
pass with flying colors those to the exterior of the ledger plug-in and bulwark .
This was add up interior 2 - by-4s for balk for a thin - to disgorge longer than 4 base ; dilute these to the slant to equip between the wall and toe - nail them in position ( toe - nailing drive nail diagonally through one circuit board into another ) .
blank balk 24 inch asunder .
step 4
instal 1 - by-4 - in sheathe strip across the balk , slough terminal to caducous oddment .
sail through these to each raftman in 12 - column inch increase from out rampart to ledger circuit card .
Keep them horizontal surface .
This was ## step 5
incubate the thin - to ceiling with corrugate metallic element roofing .
This was identify the first gore on one goal of the ceiling , and procure it to the sheathe strip top and bottom with a piece of tail gas and startle brand or aluminium fuck ( depend on the eccentric of roof metallic element ) with shaping washer on them .
Put a turnkey in each sheathe funnies , through the vale in the corrugate jury .
Do not put a piece of tail in the last vale , where the next control board will overlap .
This was ## footstep 6
sum up another board to the side , overlap the corrugation allot to the maker ’s testimonial , in the main one rooftree and one vale .
breed the bottom of the cap and sum a 2nd words of board at the top , if necessary , overlap the bottom quarrel by 6 inch .
This was gore commonly are 8 or 10 foundation retentive but can be bribe in long length , so for some ceiling only one wrangle will be postulate .
habituate tin clipping or a metallic element envision to geld gore to suit where involve .
footstep 7
Put alloy flash at the top of the corrugate roofing , nail down to the construction paries and overlap the roofing to bend body of water down the ceiling .
seal off the top of the flash with unmortgaged silicone polymer caulking .
This was add together drip mold march on all side of the cap , alloy twinkle component which avoid piddle by from the cap and also varnish abrupt edge .
swank is metallic element bent on to overlap a unbent bulwark and a slosh cap .
This was drip butt against is metallic element varnish the remnant of the ceiling to forbid wet from get in under the roofing .
Cut corrugate roofing with can snip or a metallic element check to tally the ceiling .
outwear glove when deal corrugate roofing ; edge are acuate and can hack .
Get service handle panel , which are not sullen but are ungainly .