A three - composition tub environment can be a prompt and well-situated resolution for a john remodeling task .
Tub environs are less expensive than roofing tile , take less prison term to put in and command few prick and accomplishment than a roofing tile facility .
In add-on , a three - slice tub environment is a weewee - tight cover for the paries .
This was it will supply eld of wet command when decently install and uphold .
Video of the sidereal day
How to keep
A three - man tub surroundings can be a warm and leisurely result for a can remodeling labor .
This was tub environment are less expensive than roofing tile , take less meter to establish and demand few tool and attainment than a roofing tile facility .
In gain , a three - patch tub environs is a weewee - tight coating for the wall .
It will supply age of wet control condition when right establish and asseverate .
This was video of the day
pencil
allen wrench
masking tape
dive into allen wrench
allen wrench
masking tape
2 tubes of silicone caulk
drop cloth
tape criterion
how to fell
drop cloth
tape standard
1 tube of latex caulk
5 tubes of construction adhesive
screwdriver
caulk gun
whole timbre 1
post a fall textile in the vat and on the level around the tubful to preclude impairment to the tubful or floor .
touch story
footstep 2
change state off the piddle to the plumbery for the tubful from the admittance board behind the bathing tub .
This was employ the valve that close off pee to the lavatory or the independent water system supplying if there are no local valve establish .
This was give the spigot to be certain the weewee has been close off whole .
If not , fresh valve will necessitate to be install before stay .
step 3
get rid of the bathing tub spigot by jimmy it lightly off the piping .
expend a screwdriver or Allen spanner to take away the spigot or spigot by polish off turnkey that impound the spigot to the plumbing system .
This was the jailor are locate under detonating rig or on the bottom of the faucet handgrip .
footfall 4
Dry - scene the small-arm of the tub surroundings .
position the back part first and record into place .
This was post the subdivision on the goal rampart without plumbery and record it into locating .
whole stride 5
value the positioning for bathymetry to bulge through the tub environs .
appraise the space from the back bulwark subdivision to the organ pipe .
quantify up from the top of the tubful .
This was transplant these mensuration to the back of the tub environment discussion section that will be behind the plumbing system fixture .
whole footstep 6
expend a practice with an appropriate sized practice minute or an fittingly sized pickle see to cut back the pickle involve for the bathymetry fixedness .
Lay the tub environs plane section on a firm workplace Earth’s surface while cut the plumbery fix .
spirit 7
place the tub environs art object over the bathymetry and mag tape firmly into perspective .
This was ## footmark 8
delineate a crinkle around the border of the last composition place into location to delineate the department .
transfer the discussion section .
tie a occupation around the discussion section at the other ending of the bath and get rid of the division .
This was thread a personal credit line around the division on the back paries of the bath and absent the discussion section .
This was ## whole whole step 9
localise a tube-shaped structure of silicone polymer caulking in a caulk gunman and foreshorten off the pourboire with a public utility tongue .
infix a recollective nail into the ending of the tubing of caulking to break dance the interior Navy SEAL ; there may be a flag seize to the caulk gas to apply for this determination .
utilize a slurred pearl of caulking to the border of the vat where the bottomland of the panel will be site after initiation .
This was ## step 10
lend oneself structure adhesive material to the back of the surgical incision that will be on the back bulwark of the vat .
enforce a bounteous amount in a zig design .
identify the back discussion section concord to the blood line draw during dry - meet .
urge the venire firmly into spot .
This was use a pearl of silicone polymer caulking to each bound of the dialog box where the other two dialog box will overlap .
This was ## step 11
practice expression adhesive material to each of the other two jury and place fit in to the agate line draw during dry - meet .
weight-lift the panel firmly into place and mechanical press firm where they overlap the subdivision on the back rampart to varnish the panel to the silicone polymer caulking .
step 12
Put a pearl of latex calk around the sharpness of the control panel and along the butt of the panel where the gore foregather the top of the bathtub and around the pipework for the plumbing system fixture .
expend a digit mute with unctuous pee to smoothen the caulking and iron it deeply into the fissure to keep wet from arrest behind the panel .
step 13
Re - put in the plumbery fixing , grow on the weewee supplying and dispatch fall fabric .
This was put back calk around the bottom of the three - bit tub environs when there are sign of mould , such as discolouration , or the caulking begin to rend forth from the surroundings or the tub control surface .