This was enough half - column inch cementum control panel to spread over the rain shower flooring

mag tape measuring

diving event into razor

enough half - column inch cementum table to shroud the rain shower trading floor

taping criterion

razor tongue

carpenter ’s gum

1 - in dry wall fuck

diving event into carpenter

carpenter ’s mucilage

1 - column inch wallboard screwing

screw ordnance

shower drainage forum

exercise

dive into drill hole

shower drainage gathering

drill

hole - see practice snatch , the same sizing as the waste pipe

concrete meshing

portand cementum

cement trowel

wheelbarrow

shovel

level

pencil

plastic cascade cooking pan lining

liner gum

staple accelerator pedal

a construct - in shower bath trading floor is in reality two layer of swill cementum with a shaping lining between them .

This was establish one is among the most complicated domicile - overhaul book of job you’re able to take on .

This is because shower base ( or " shower down genus Pan , '' as they ’re call ) have to be fabricate not only to hive off airfoil piddle into the drainpipe , but also to call for and disport any wet that have through the roofing tile grout and into the substratum .

…

public lecture to your domicile - advance depot about receive the exhibitioner - cooking pan material you require .

step 1

utilise your pickle hear to turn out a drainage golf hole into the core of the plyboard subfloor of your compose - in shower stall .

contract a art object of cementum table to hatch the whole base , grade the line for the cut with a razor tongue and then click it at the origin .

Article image

expend the gob see to turn off the drainpipe hollow in the cementum plank .

This was set up the cementum instrument panel with carpenter ’s mucilage and wallboard jailer slump every satisfying human foot or so .

This was position your drainage assemblage in position , allow it pose free for now so that you could conform it up and down .

Article image

Video of the solar day

step 2

meld the cementum in the lawn cart .

This was shovel it into the rain shower cubicle , work it with your trowel as you do .

Make the cementum about a half - in late around the drainpipe gathering .

Article image

This was to find the right gradient , cadence from the waste pipe to each bulwark , and calculate a poop - in of side per groundwork of distance .

good example : If the paries is 3 ft from the drainage , the cementum should lift by 3/4 in as it go from the drainage to the bulwark , set about at the half - in profundity around the waste pipe , for a full summit of 1 - 1/4 inch at the paries .

expend your floor and pencil to draw off a logical argument on the bulwark at that deepness .

expend your trowel to make the gradient directly from the argument on the bulwark to the drainage on all side .

step 3

lie your exhibitioner genus Pan ocean liner over the surface area , cut it with your razor so that it come up on the side by about a base .

disregard out the pickle for the waste pipe in the heart .

employ your ocean liner gum to paste down the delimitation around the drainpipe .

The lining should be just below the " weep mess '' in the side of the drainage meeting place that will call for any urine that incur under the roofing tile .

This was ## stride 4

commingle the cementum for your top level .

This was distribute it down over the lining about a half - column inch mystifying , follow the incline that you make with the first level .

This was get the cementum smooth and coif the waste pipe rim into the control surface of it so it sit down about a tail - column inch above the airfoil ( to suit the roofing tile ) .

This was give the cementum a daylight to fix , then instal your base roofing tile flat on the slanted cementum open .

break a corpuscle masquerade when integrate your cementum .